[Asia Economy Yeongnam Reporting Headquarters Reporter Park Saeyan] The Sewerage Office of Changwon City, Gyeongnam, conducted on-site administration on the 3rd by inspecting the sewage inflow blocking construction site into the river.
The Sewerage Office is carrying out maintenance of 48 faulty sewage connection units within residential areas near Bukseong Elementary School in Seokjeon-dong and the Guam-dong area, including repairing sewage connection pipes L=397M and damaged stormwater pipes L=14M, aiming to block pollutants flowing into the river.
Through this construction, the Sewerage Office plans to block pollutants flowing into Samho Stream and Sogye Stream and also block odors generated within the nearby residential areas.
In particular, by blocking domestic wastewater flowing into the river, it is expected to greatly contribute to improving the water quality environment of Masan Bay.
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

![Clutching a Stolen Dior Bag, Saying "I Hate Being Poor but Real"... The Grotesque Con of a "Human Knockoff" [Slate]](https://cwcontent.asiae.co.kr/asiaresize/183/2026021902243444107_1771435474.jpg)
