본문 바로가기
bar_progress

Text Size

Close

Taeyoung Construction Wins 600 Billion KRW Contract for Mixed-Use Complex in Yucheon-dong, Daejeon

[Asia Economy Reporter Kim Min-young] Taeyoung Construction announced on the 8th that it has won the contract for the construction of two new mixed-use residential and commercial blocks located in Yucheon-dong, Jung-gu, Daejeon.


Block 1 is valued at 249.77 billion KRW, and Block 2 at 345.22 billion KRW, totaling 594.9 billion KRW. Block 1 will be constructed as a mixed-use complex in the Yucheon-dong area, consisting of 5 basement floors and 49 above-ground floors, with 718 residential units and 32 officetel units.


Block 2 will be built in the Yucheon-dong area with 5 basement floors and 49 above-ground floors, comprising 913 residential units and 88 officetel units. The contract periods for Blocks 1 and 2 are 49 months and 51 months respectively, starting from the commencement date.


© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Special Coverage


Join us on social!

Top