본문 바로가기
bar_progress

Text Size

Close

POSCO E&C to Launch 'The Sharp Geochang Porsiel Phase 2' in Geochang, Gyeongnam Next Month

POSCO E&C to Launch 'The Sharp Geochang Porsiel Phase 2' in Geochang, Gyeongnam Next Month The Sharp Geochang Porciel Phase 2 Bird's-eye View


[Asia Economy Reporter Ryu Tae-min] POSCO Engineering & Construction is scheduled to launch The Sharp Geochang Porciel Phase 2 in Geochang, Gyeongsangnam-do next month.


The Sharp Geochang Porciel Phase 2 will be located at 1323-4 Gajiri, Geochang-eup, Geochang-gun, Gyeongnam. It will consist of 6 buildings, ranging from 2 basement floors to 20 above-ground floors, with a total of 443 units sized between 84 and 158㎡. The unit types are ▲84㎡A 214 units ▲84㎡B 131 units ▲84㎡C 16 units ▲109㎡ 38 units ▲119㎡ 38 units ▲141㎡ 2 units ▲158㎡ 4 units.


Geochang-gun, where The Sharp Geochang Porciel Phase 2 is located, belongs administratively to Gyeongsangnam-do but is conveniently accessible due to its proximity to Jeonbuk, Gyeongbuk, and Daegu. The Gwangju-Daegu Expressway and Daejeon-Tongyeong Expressway are easily accessible, and additional transportation infrastructure such as the Hamyang-Ulsan Expressway (scheduled for 2024) and the Dalbit Inland Railroad (scheduled for 2030) are planned. A planned four-lane road connecting the complex’s northern entrance is expected to open in 2023, further improving accessibility.


The Sharp Geochang Porciel Phase 2 is situated in the Gangbuk area of Geochang-eup, considered the center of Geochang, which boasts abundant living infrastructure and high residential preference. Nearby schools include Arim Elementary, Daeseong Il High School, Daeseong Middle & High School, and Geochang Central High School, all within walking distance.


The Geochang Legal Town, where the Changwon District Court and Prosecutor’s Office (Geochang branch) are relocating, is also planned near the complex, making The Sharp Geochang Porciel Phase 2 a key residential area for legal town personnel. Additionally, the complex is close to convenience facilities and natural environments such as Hanaro Mart, Geochang Market, Jukjeon Urban Forest Park, and Geochang Reading Park, as well as administrative institutions including Geochang County Office and Geochang Tax Office.


The Sharp’s distinctive design stands out as well. For residents’ convenience, electric vehicle charging facilities will be installed, and POSCO Engineering & Construction’s smart technology AiQ TECH will be applied to automatically control lighting, heating, gas, and ventilation. UV-C LED sterilization lighting will be installed inside elevators to eliminate fine viruses and bacteria.


A sales official stated, “The Sharp Geochang Porciel Phase 2, together with the previously supplied Phase 1 complex, is forming a first-class brand town unseen in Geochang, attracting early interest. With excellent product quality, location, and competitiveness as a non-regulated area, we expect another successful sales performance.”


© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Special Coverage


Join us on social!

Top