Kim Kyung-wook, President of Incheon International Airport Corporation (right), visited the west side of the 4th phase construction site at Terminal 2 of Incheon International Airport on the 4th and received a briefing on major measures to prepare for the heatwave. /Airport Photojournalists Group
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.
![[Photo] 'How is Heatwave Preparedness at Incheon Airport Construction Site?'](https://cphoto.asiae.co.kr/listimglink/1/2021080411280263302_1628044083.jpg)

