Sanggaedong Gamnamu Jinsa Intersection to Seonam-dong Myeongdong Samgeori 3.46km Section
Chronic Traffic Congestion Relief at Duwang Intersection and Expected Logistics Cost Reduction
[Asia Economy Yeongnam Reporting Headquarters Reporter Kim Yong-woo] The road connecting Sanggae to Maeam, which links the Industrial Road and Nambu Sunhwan Road?two of the busiest traffic routes in Ulsan?via the shortest distance, has been opened.
Ulsan City announced that the "Congested Road Improvement Project" for this section has been completed and that an opening ceremony will be held on the 28th.
On that day at 3 p.m., Mayor Song Cheol-ho, local members of the National Assembly, and residents will attend the "Sanggae to Maeam Congested Road Improvement Project Opening Ceremony" at the entrance of Seonam Tunnel in Seonam-dong, Nam-gu.
This project was included in the Ministry of Land, Infrastructure and Transport’s "2nd Metropolitan Area Congested Road Improvement Project Basic Plan" in 2012 and was promoted with a total budget of 90.7 billion KRW from national and city funds.
The road stretches 3.46 km with a width of 20 meters, from Gamnamujinsa Intersection in Sanggae-dong, Nam-gu to Myeongdong Samgeori in Seonam-dong. Construction began in March 2017 and the road opened after four years. The section includes five bridges and two tunnels.
Mayor Song Cheol-ho of Ulsan said, "This east-west arterial road connected to Ulsan Bridge and its access roads will alleviate chronic traffic congestion," adding, "It is expected to greatly contribute to reducing logistics transportation costs for companies moving through the Gyeongbu Expressway to Ulsan Mipo National Industrial Complex and the petrochemical complex."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.


