본문 바로가기
bar_progress

Text Size

Close

Nighttime Control Due to Facility Construction at Busan Mandeok 1·2 Tunnel

Full Closure for Lighting Replacement in Tunnel 1 from 22 to 30... Partial Closure for CCTV Installation in Tunnel 2 from 15 to 19

[Asia Economy Yeongnam Reporting Headquarters Reporter Kim Yong-woo] Traffic on the 1st Mandeok Tunnel and the 2nd Mandeok Tunnel, which connect Oncheon-dong and Mandeok-dong, will be restricted due to lighting and CCTV installation work.


The 1st Mandeok Tunnel will be completely closed to nighttime traffic from 11 PM to 5 AM the next day from the 22nd to the 30th for the replacement of old lighting. Vehicles that would normally use the 1st Tunnel during this time must detour via the 2nd Mandeok Tunnel or the alternative Sanbok Road.

Nighttime Control Due to Facility Construction at Busan Mandeok 1·2 Tunnel Location map of Je1 Mandeok Tunnel.



The 2nd Mandeok Tunnel will have partial lane restrictions on the left lane in the Minam to Mandeok direction from 11:30 PM to 5 AM the next day from the 15th to the 19th to install 30 high-resolution remote monitoring CCTV cameras.

Nighttime Control Due to Facility Construction at Busan Mandeok 1·2 Tunnel Location map of the 2nd Mandeok Tunnel.



If it rains or other circumstances arise, the construction schedule will be adjusted.


© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Special Coverage


Join us on social!

Top