Traffic Resumes on Gangbyeonbuk-ro from Mapo Bridge to Hangang Bridge
On the 6th, both directions of the section from Dongjak Bridge to Gayang Bridge on Olympic-daero in Seoul, as well as both directions of Gangbyeonbuk-ro from Mapo Bridge to Dongjak Bridge, are closed due to heavy rain caused by Typhoon Hinnamnor./Photo by Kang Jin-hyung aymsdream@
[Asia Economy Reporter Lim Cheol-young] Seoul city announced that vehicle traffic on the Dongbu Expressway from Gunja Bridge to Seongsu JC, the Inner Circular Road from Majang Ramp to Seongdong JC, and the Gangbyeonbuk-ro from Mapo Bridge to Hangang Bridge, which had been restricted due to heavy rain in Seoul and the central region, resumed from 11:30 AM on the 6th.
Seoul city stated, "The Olympic-daero (from Gayang Bridge to Dongjak Bridge) and Yeoui upstream and downstream ICs, where traffic control is still in place, are continuously monitoring the discharge volume of Paldang Dam and the water level of the Han River," adding, "Once the control water level (5.53m) drops below the threshold, traffic will be resumed immediately."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

