On the 9th, when record-breaking heavy rain fell mainly in the central region including Seoul, vehicles were moving slowly on Olympic-daero as seen from the 63 Square Observatory in Yeouido. From 2:30 PM, vehicle traffic in both directions on Olympic-daero between Gayang Bridge and Dongjak Bridge resumed. The Seoul Metropolitan Government announced, "We have fully reopened vehicle traffic in the section that was controlled due to increased discharge from Paldang Dam." / Reporter Mun Honam munonam@
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.
![[Photo] Olympic-daero Gayang Bridge~Dongjak Bridge Two-Way Traffic Resumes](https://cphoto.asiae.co.kr/listimglink/1/2022080915395780782_1660027198.jpg)
![Clutching a Stolen Dior Bag, Saying "I Hate Being Poor but Real"... The Grotesque Con of a "Human Knockoff" [Slate]](https://cwcontent.asiae.co.kr/asiaresize/183/2026021902243444107_1771435474.jpg)
