본문 바로가기
bar_progress

Text Size

Close

Jang Se-yong, Mayor of Gumi, Orders Full Reconstruction of the Entire First Floor of 5 Buildings at Gumi 'Jungheung S-Class'

Jang Se-yong, Mayor of Gumi, Orders Full Reconstruction of the Entire First Floor of 5 Buildings at Gumi 'Jungheung S-Class' Formwork of a newly built apartment collapsed due to strong winds. [Image source=Yonhap News]

[Asia Economy Yeongnam Reporting Headquarters Reporter Yeo Jong-gu] On the 13th, a formwork tilting accident occurred at the Jungheung S-Class construction site in Gumi, Gyeongbuk, where Jungheung Construction is the contractor.


The city immediately visited the construction site to assess the accident situation and issued a work stoppage order until emergency on-site restoration is completed.


In addition, the city ordered the complete removal of the tilted formwork along with the connected formwork and rebar, and instructed the full reconstruction of the entire front of the first floor of Building 5 as a preemptive measure against potential future problems.


Jang Se-yong, mayor of Gumi, said, “Since the anxiety and distrust of the prospective residents are significant due to this accident, do your best to prevent recurrence and improve quality regarding the response measures.”


© The Asia Business Daily(www.asiae.co.kr). All rights reserved.

Special Coverage


Join us on social!

Top